Abstract
CEBAF, The Continuous Electron Beam Accelerator Facility, is centered on a 4 GeV recirculating linac which has recently started routinely producing beam to the first of three experimental halls. Hall A, the second of three experimental halls, houses two high resolution spectrometers, HRS, and is due to become operational by the end of 1995. Each HRS consists of two nuclear physics detectors, with optics determined by a superconducting dipole and three superconducting quadrupoles cooled by the End Station Refrigerator, ESR. Minimization of the total heat load from Hall A to the refrigerator is essential since the capacity is fixed. The design, construction, and initial test of the cryogenic distribution system and how the overall heat load is controlled are discussed in this paper.KeywordsTransfer LineHeat LeakCryogenic SystemExperimental HallCryogenic EngineerThese keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.