Abstract
This paper presents the results from experimental study of borehole heat exchangers (BHE) installed in a ground source heat pump (GSHP) system in Nuremberg, Germany. The BHE was constructed with 18 boreholes that can be grouped into three blocks: block I of 121mm, block II of 165mm and block III of 180mm. The operation of the GSHP system had been monitored between March 2009 and October 2012 for analysis. Over years of the system operation, the thermal performance of BHEs is observed to be slightly improved for larger borehole diameters (block II and III). For the comparison among the three blocks, thermal loads of block II is 1.64% and block III is 3.45% larger than that of block I, respectively. Furthermore, saving-to-investment ratio (SIR) is evaluated for two parts: the basic part (SIRI) for block I; the extra parts (SIRII-I, SIRIII-I) for block II and block III. Over a thirty-year period the SIR is estimated to be 4.80, 2.14 and 3.18 for SIRI, SIRII-I and SIRIII-I, respectively. These findings suggest that block I has the highest economic profitability. Based on these evaluations, the acceptable drilling costs for block II and block III are also analyzed and discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.