Abstract

The problem of temperature variation in mass concrete construction is a crucial problem in civil engineering. The problems of the temperature field, damaged areas, and the cracking of the structure during the construction process of concrete pouring are analyzed in this paper. An elastic and damaged constitutive model for concrete and a fully coupled analysis method for analyzing the temperature-stress field was proposed to simulate and predict the construction process of a concrete structure in a metro station. The influence of different concrete compositions and material properties was not taken into account in this study. The results show that the temperature-stress complete coupling analysis method can be applied to the calculation and analysis of cracking in a concrete structure that is caused by internal temperature variations during the pouring process of complex concrete structures. An efficient method and research approach is proposed by this study to analyze the damage and cracking issues caused by temperature changes during the pouring process of concrete structures in metro stations. The area and extent of the damage and cracking during the construction can be predicted and evaluated, and a reference for metro station construction and operation is proposed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.