Abstract

Based on the project of construction monitoring for cable structure of the roof of Shenzhen Baoan stadium, the displacement and stress of outer compressive ring caused by temperature change were monitored before the radial cable was tensioned, analyzed and compared the monitoring results. Comparing the measured results and simulation results shows the temperature change characteristics of outer compressive ring and the temperature change characteristics are valuable for delicacy construction of other similar projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.