Abstract

The Injector-II of ADS project will include two cryomodules, each of which consists of eight HWR cavities and nine SC solenoid magnets. A test cryomodule (TCM1) containing one HWR cavity and two SC magnets was developed for verification of related technique at the first stage. The TCM1 cryostat was designed by Shanghai Institute of Applied Physics of Chinese Academy of Sciences (SINAP, CAS). The cold mass support assembly in the test cryomodule should accommodate the unbalanced loads induced by each cold mass assembly, the deformation induced by thermal shrinkage, and the thermal stress between different materials. In order to validate the structure design, coupled thermal and mechanical analysis on the cold mass support assembly was performed. The temperature, deformation and stress of the cold mass support assembly were obtained. The results effectively provide the guideline for the design and improvement of the cold mass support assembly.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.