Abstract
Expansion joint of a bridge is a weak part of structure, it leads to early structure destroy and reduces the bridge life. The paper put forward a new type of Jointless Bridge --- Semi–Integral Abutment Jointless Bridge, and its theoretical model was built. An engineering of four spans 100m length Prestressed Concrete Semi–Integral Abutment Jointless Bridge was analyzed, and results that its mechanical performance is so excellent that it should be wide applied in bridge engineering.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.