Abstract

Global survival and human comfort in now a day strongly depend upon energy and environment. In this research generalized thermodynamic model equations were subjected to 4MW rice husk fired thermal power plant in Pakistan for theoretical investigations on work lost and entropy generation to check the plant thermal performance and irreversibility’s and concluded that the entropy generation and work lost is highest in Furnace/Boiler that is 3487.12352 KWK-1 and 1039.685 ×103 respectively. The work lost in Furnace/Boiler is about 32.4641% while the overall efficiency of the power plant is 59.8917%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.