Abstract
Direct smelting of zinc sulfide concentrates by forced melt circulation offers substantial energy savings in comparison with the roast leach electrowin (RLE) process. This article is focused on slashing even further the electrical energy input. The modified technology is natural gas based. For pure zinc sulfide, the projected energy savings are about 73 pct, provided gaseous zinc is condensed efficiently.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.