Abstract
With the increase of the tie points in the distribution network and the demand for the reliability of power supply, it has been a natural trend to transfer load without black-out by loop closing. The feature of operation by partitions in 220kV network of Shanghai grid makes the loop current varied in direction and amplitude when loop-closing occurs in lower-level distribution network. This paper analyzes the loop closing between feeders of distribution network. The mesh equivalence was applied in the loop-closing calculation of 10kV distribution network, and the complete algorithm is presented. The sample provides important references for dispatchers to arrange the operation mode reasonably and transfer emergency load in accidents.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.