Abstract

It is a consensus to consider the superposed working conditions when calculating the surge wave in surge tank of hydropower station with long diversion tunnel. For the hydropower station with single surge tank, the method of determining the worst superposed moment is mature. However, for the hydropower station with upstream series double surge tanks, research in this field is still blank. Based on an engineering project, this paper investigated the worst moments and the control superposed working conditions about the maximum surge level and the minimum surge level of upstream series double surge tanks using numerical simulation. In addition, the incidence relations between the worst moment of superposed surge wave and the different areal array and distance between the two surge tanks are also carried out. The results showed that: With the decrease of the distance between auxiliary surge tank and upstream reservoir, the maximum values of the highest surge levels in the two surge tanks always reach close to but a little earlier than the bigger one time when the inflowing discharges of the two surge tanks reach the maximum. It is similar to the minimum values of lowest surge levels in the two surge tanks which also reach close to but a little later than the bigger one time when the outflowing discharges of the two surges reach the maximum. Moreover, the closer the area of auxiliary surge tank to the area of main surge tank is, the closer the worst moment to the bigger one time when inflow or outflow of the two surges reach the maximum will become.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call