Abstract

Workload control (WLC) has been elaborated in the early 1980s to a hierarchical production control concept for job shop manufacturing. In the 1990s the analytical research at the University of Groningen focused on assessing the strengths and weaknesses of this concept and on developing alternatives. Research at the University of Hannover focused on improving the practical applicability of the WLC concept. While the practical experiences confirm the strengths of the WLC concept, some extensions of the basic concept have been developed which may overcome some weaknesses suggested in literature. This paper aims at bringing the theoretical and practical knowledge regarding the WLC concept together. It gives a review and classification of strengths and weaknesses reported from analytical research and it discusses the extensions that have been developed based on practical experiences.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.