Abstract

The largest thermal power plant in Shaanxi Province, Dang Pucheng (No. 2) Power Generation Co., Ltd. (hereafter referred to as Pudian business), is situated in Sunzhen Town, Pucheng County. On October 1,2020, Pudian's affiliation with China Huadian Group was terminated and transferred to China Datang Group. They are divided into Datang Pucheng Power Generation Co., Ltd. and Datang Pucheng No. 2 Power Generation Co., Ltd. with two brands and a specific set of organizational operation modes as a result of the various investors. The Pudian Company employs around 1400 people in 15 departments, and Pudian company's main business are: building and running power supply projects; producing and selling electricity; fully using and managing waste generated by power plants; providing consultancy services in the field of power technology; and training professionals in the field of thermal power operation and maintenance.Rapid Transfer of Talents from Thermal Power Plants to New Energy Power Generation Industry under "Double Carbon Goal" The human resource management of Pucheng Power Plant in the new energy power generating industry has not been extensively evaluated in the prior literature. Using Porter's five forces model and Maslow's demand theory. this study analyzes and proposes solutions to the challenges of Pucheng Power Plant in the growth of the new energy power generating industry. A brief introduction to the challenges in human resource management at Pucheng Power Plant Difficulties and Solutions in the Process of Green Transformation of Pucheng Power Plant Application and Suggestions Based on Porter's Five Forces Model and Maslow's Demand Theory.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call