Abstract

Abstract To evaluate work load in ATC-tasks the method of subjective rating has been applied in addition to the recording of physiological data and objective work factors. A scoring method and a procedure for observer rating have been used to record variations in the subjective feeling of work load. The results of subjective rating have been related to different measures of information processing. Some problems concerning the influence of individual capacity in the procedure of observer rating for the evaluation of work load and the difficulties in defining ‘ difficulty of the control task ’ are discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.