Abstract

A ‘Process Cost Model (PCM)’ approach has been proposed previously (Aoieong et al., 2002) for measuring the quality costs of construction projects. The PCM is proposed because the traditional models on PAF (prevention, appraisal and failure) quality costs have been found to be unsuitable for the construction industry, although they may be successful in the manufacturing industry. The focus of PCM, unlike PAF model, is no longer on capturing the total quality costs of an entire project but the quality costs of a particular process. It is simple and more feasible to be applied in construction projects and is in line with the ‘process approach’ and ‘continual improvement’ concepts of the latest (year 2000) version of the ISO 9000 quality management system, which is a step closer to Total Quality Management (Aoieong and Tang, 2002). The current paper describes two case studies using the PCM to capture quality costs on two construction projects. The case studies reveal that the PCM is feasible, practicable and easy to use. It is also possible to use the model to achieve ‘continual improvement’ by referencing the quality costs of a particular construction process. The Process Cost Model (PCM) is therefore a better model than the traditional PAF model for application in the construction industry for measuring quality costs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.