Abstract

The Tennessee Department of Transportation (TDOT) in the United States has become the national leader in the design and construction of jointless bridges with abutments which are integral with the bridge deck. While TDOT criteria call for limits of length of 152 m (500 ft) and 244 m (800 ft) for steel and concrete bridges, respectively, they have on more than one occasion exceeded these limits significantly. TDOT's desire to address any questions raised about the efficacy of using prestressed concrete piles to support integral abutments and perhaps to extend the limits on bridge length led to the tests reported in this paper. Four full-size abutments, 3·05 m (10 ft) wide, were built and tested in the field. The description and results of these tests are reported and discussed. Of particular interest are the testing of one pile to failure and the cyclic tests performed on one pile. The conclusions drawn were, first, that prestressed concrete piles are appropriate to use to support integral abutments and, s...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.