Abstract
Several 13.2 kV, 21,000 HP synchronous motors failed as a result of interturn insulation breakdown. Investigation of motor failures indicated that the cause was related to high magnitude, steep fronted surge waves (References 1 and 2). Partial discharge (corona) related failures were discounted without any actual measurements. To confirm the validity of the previous investigation, partial discharge testing was conducted on four new 21,000 HP motors and on one failed 21,000 HP motor. Additionally, surge impulse testing was performed on the failed motor to assess interturn insulation endurance. This paper presents the results of above tests. It is concluded that failure of motors could not be caused by corona, Confirmation of previous investigation results indicated that partial discharge testing can be used as a diagnostic tool in the evaluation of interturn insulation of large motor.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.