Abstract

In this research, a modeling for problem of project scheduling is presented with cut allowance and multiple administrative methods for each activity considering costs of earliness and tardiness. Genetic algorithm was used to solve this problem, and finally in order to prove algorithm’s capability solving mentioned problem, the results were compared with absolute and exact results by LINGO software for small problems and evaluation indicators of algorithm for big ones, respectively. In the end, a proper algorithm with desired efficiency is presented to solve the above problem.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call