Abstract

This paper shows the use of fuzzy logic to evaluate the effectiveness of the reinforcement of Santa Branca dam. The embankment reinforcement was found imperative once the dam had shown signs of instability process, as undesirable seepage and unexpected movements, just after the first impoundment. Stability analyses were carried out considering fuzzy variation of the strength parameters in order to assessing the non-random uncertainties associated with their evaluation. These uncertainties are mostly connected to values varying within a specified interval, whose boundaries express the possibility of occurrences that, in turns, account for vagueness in information. Finally, the fuzzy Factor of Safety distribution resulting from these analyses is then compared to pre-defined fuzzy class intervals in order to classify the failure potentiality of the embankment, before and after the reinforcement has been constructed, reflecting, thus, its effectiveness.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.