Abstract

Flight testing of modern high performance aircraft has generated an increasingly complex data handling workload and this contributes significantly to the duration and cost of flight test programmes. Automation of this critical data handling process can reduce the high cost of such a programme by reducing its duration. The effects of automation of data flow at the ground station can be enhanced by the use of immediate flight analysis of data telemetered from the aircraft.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call