Abstract
During execution projects may be subject to considerable uncertainty, which may lead to numerous schedule disruptions. Recent research efforts have focused on the generation of robust project baseline schedules that are protected against possible disruptions that may occur during schedule execution. The fundamental research issue we address in this paper is the potential trade-off between the quality robustness (measured in terms of project duration) and solution robustness (stability, measured in terms of the deviation between the planned and realized start times of the projected schedule). We provide an extensive analysis of the results of a simulation experiment set up to investigate whether it is beneficial to concentrate safety time in project and feeding buffers, or whether it is preferable to insert time buffers that are scattered throughout the baseline project schedule in order to maximize schedule stability.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.