Abstract

Abstract We describe the planned upgrade to the Level 3 trigger for the CDF (Collider Detector Facility) detector at Fermilab to enable us to take advantage of the increased luminosity expected in the 1991 Tevatron Collider run. The system that has been chosen is the Silicon Graphics 4D/200 family of servers. We describe the reasons for this choice and the results of the tests we have performed to determine the suitability of the system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.