Abstract

The two bridges featured are precast segmental concrete box girders built by the balanced cantilever method. Crossing a hydro tailrace, this $11 million project forms a part of the new Highway 406 through St. Catharines, Ontario. Several unique features of the structures are highlighted. These features include transverse rib beams employed at each segment face to support the deck slab; flaring of the deck slabs to accommodate on and off ramps; and twisting horizontal alignment of the highway. Both bridges have a depth-to-span ratio of 1:27, which results in one of the most slender precast box girder bridges built by the balanced cantilever method. The construction phase of this project is reviewed with particular attention to the casting operation and to the erection of the segments employing a steel launching truss. Design- and construction-related problems encountered are presented and reveal that the more perplexing problems are generally those not related to the complexities of the segmental form of construction but rather to the more mundane aspects of posttensioned concrete bridge construction. Key words: precast segmental concrete box girder bridges, balanced cantilever methods, steel launching truss, short line casting bed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.