Abstract
The Tritium Plant of ITER-FEAT is essential for the operation of the machine after the initial hydrogen phase, as tritium will be produced from DD fusion reactions. Within the fuel cycle of the Tokamak deuterium and later also tritium will be provided to the Fuelling Systems, and the unburned DT fraction recovered from the exhaust gases. The design of the tritium fuel cycle has to be based upon well proven technology to assure the safe handling of tritium along with credible accountancy, low tritium inventory, low generation of wastes and a high reliability of all components throughout the lifetime of ITER-FEAT.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.