Abstract

This paper presents the results of a case study, the Construction Case, which examines procurement practices within the UK construction supply chain and compares these with a more general UK sample taken from non-construction sectors. Using a qualitative methodology, the approaches to relationship management and buyer value perception are graphically mapped, using an innovative ‘transaction X-ray’ technique. The Construction Case considers procurement transactions conducted at various points along the construction value chain: the client, the construction firm and the specialist contractor. Recognising that the research design favours a small sample size, and thus limits generalisability beyond the boundaries of the case, the paper finds that construction industry procurement operates in an adversarial and largely arm’s-length manner. While procurement practice is found to share common aspects with other industrial sectors, the case demonstrates that the construction industry is more adversarial and less collaborative than is the average found across the other sectors examined. The paper outlines a useful framework whereby construction practitioners can evaluate elements of procurement practice within their own organisations, and also signposts the required direction for future research in order to reflect the gap, suggested by the case, between current normative theory and construction procurement practice.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.