Abstract

The 20 MW, 5 GHz, LHCD system for ITER aims mainly at controlling the q-profiles in partially (hybrid regime at IP = 12 MA) and fully non-inductive steady-state operation (IP = 9 MA). In the last few years several European associations have given their contribution to the solution of many prominent problems on the road to the design of an efficient and reliable system. LH coupling has been achieved on JET in physics scenarios relevant for ITER, while the reliability of the LH for long pulse operation has been ascertained on Tore Supra. A downscaled prototype of the Passive Active Multijunction (PAM) launcher presently proposed for ITER, has successfully demonstrated on FTU its good coupling characteristics, power handling capability and current drive efficiency. An ITER relevant launcher, based on the PAM concept is presently under construction to be installed on TORE SUPRA to investigate the technological solutions (materials, cooling, etc.) envisaged for this launcher.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.