Abstract

Infrastructure development is followed by an increase in demand for ready-mix concrete (RMC). Some failures in delivering RMC on time would delay construction performance or the truck would need to wait at the construction site, so the delivered concrete became useless if it exceeded the concrete setting time limit. This research optimizes the supply chain of ready mix concrete based on real-time data from a batching plant in Surabaya by using the metaheuristic method. The metaheuristic method used in this research are Particle Swarm Optimization (PSO) and Symbiotic Organisms Search (SOS), and also compares the performance of both metaheuristic algorithms, because both algorithms have proven effective in solving various optimization problems. The objective function of this research is to minimize the total waiting times of mixer trucks. The results showed that the SOS algorithm has better performance than the PSO algorithm, which gets lower total waiting times of 100,863 hours.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.