Abstract

This paper tries to use Data Envelopment Analysis (DEA) as the foundation, combining Fuzzy Comprehensive Assessment (FCA) method and Analytic Hierarchy Process (AHP), to make decisions for the project. First we use FCA method to analyze and quantize each index, then use AHP method to determine the weight of each index, use Evaluation Model of DEA Cross-efficiency to reduce the error of expert evaluation and weight in the FCA method. This paper will give the detailed steps. Finally, we use a case to test the reliability and feasibility of our method. We think, this paper will provide a now method for the Construction project bidders.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.