Abstract
In recent years, china are paying attention to the development of the circular economy and the ecological industrial parks, industry, as the industry of the largest emissions of industrial waste, the circular economy is more concern by people. The recovery transport process of industrial waste recycling is the important part of the industrial circular economy, reasonable scheduling solution is the effective means to improve the recovery and processing speed of industrial wastes and make the cost of recycling lower. In this paper, through analysis and research the recovery transport links of industrial waste recycling, points out that the vehicle scheduling problem of industrial waste recycling is the scheduling problem combined full load with not-full load, and for this problem, build vehicle scheduling optimization model, use ant colony optimization algorithm to solve it, and that achieved good results.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.