Abstract
This paper discussed systematic approach for the re-allocation of production line in Safety Shoes Co. Ltd., in Thailand. The production system can be classified in to 2 main production lines base on the shaping processes. The first one is traditional production line and the second one is called STROBEL production line. The main objective of this study is to reduce the traveling distance and time to transport raw materials and Work in Process (WIP) circulating in the factory. After several rounds of data collection, the research team analyze system layout by modifying the Simplified Systematic Layout Planning (SLP) technique to make it more suitable to the scope of the study and timeframe. From the analysis, the new layout design could help reduce the traveling distances for about 36% of that of the traditional method, and about 33.5% of that of the STROBEL method. The results are being proposed to the executives of Safety Shoes Co., Ltd. for their considerations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.