Abstract

This paper studies the THD and AC losses on the DC cables of offshore wind farm-based multi-terminal HVDC systems when they extract and deliver power from and to more than one connection point. In the paper, the study of a full system PLECS + Simulink model with two branches, including a wind resource, a wind turbine, a Permanent Magnet Synchronous Generator (PMSG), a Pulse Width Modulation (PWM) rectifier, a Single Active Bridge (SAB) DC–DC converter, an Input Parallel Output Series (IPOS) DC–DC converter, HVDC cables, and a simplified onshore system, is presented. It focuses on the investigation of the output ripple content of multiple DC–DC converters on DC cables under different wind conditions with different voltage and power ratings. The importance of the study is providing a general understanding of the operation of the innovative offshore wind farm-based DC system, as well as the interaction between different DC–DC converters and their influence on cable ripple content under different situations.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.