Abstract

Scheduling with group technology has been a vivid research area in the past decades. However, group technology with general dual-effect variable processing times needs to be further explored although this kind of group technology plays an important role in some actual manufacturing scenarios. Accordingly, this paper considers group scheduling problems with a kind of general group variable processing times model, where the actual processing time of each job in group is variable due to the dual effect of both the job position and the group position. The objectives of two types of considered problems are to minimize the makespan and the total completion time, respectively. Based on the decomposition analysis, the mathematical logic analysis and the computational complexity proof, it is obtained that the makespan minimization problem and the total completion time minimization problem are both polynomially solvable under the condition that the group number is constant. For three special cases of considered problems, polynomial solving algorithms with lower computational complexity are proposed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.