Abstract

AbstractThe new railway crossing over the River Sado at Alcacer do Sal in Portugal required a 2.7 km long bridge, comprising two approach viaducts and a main bridge. Steel‐concrete composite decks were adopted, the approach viaducts having plate girder decks with 45 and 37.5 m spans, and the main bridge three spans of 160 m each with a box girder deck. The main bridge, with a continuous deck over 480 m, consists of three continuous bowstrings with a single plane of hangers on the bridge axis. The main aspects of the bridge concept design are described and the steel design in particular is discussed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.