Abstract

As Zibo power plant original steam pipes for a long time to run, the strength decreased and resistance was large, transformation was proposed to optimize. A mathematical model of the main steam pipe network was established to analysis changes of temperature, pressure and velocity vector before and after transformation. After transformation, the loss was significantly reduced,so transformation successfully achieve the optimization, adjustment and analysis functions of the main steam pipe network.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.