Abstract

The development of any new power generation system which can make a major contribution to our energy needs is a multi-faceted task involving the utilization of major human and material resources. The LMFBR development, which has the potential for supplying abundant energy for generations, is therefore a large, multi-faceted program. Giving you a description of its status in a single paper necessitates a high degree of summarization and some selection for emphasis. This summary will cover: (1) the need for the liquid metal fast breeder reactor, (2) an overall perspective of its development throughout the world, (3) a brief look at the in-depth technological development program in the United States, (4) a description and status of the two major projects now underway in the program, the Fast Flux Test Facility and the Clinch River Breeder Reactor Plant, and (5) a review of the plans for continued development to achieve a reliable, safe and economic power generation system for practical commercial use on the utility networks of the country.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.