Abstract

The Run II at Fermilab is progressing steadily. In the Run IIa scheme, 36 antiproton bunches collide with 36 proton bunches at CDF and D0 interaction regions in the Tevatron at 980 GeV beam energy. The current status and performance of the Fermilab Accelerator Complex is reviewed. The plans for Run IIb along with the Antiproton Source upgrade and incorporation of the Recycler Ring in the accelerator chain are outlined. The prospects of achieving Run II integrated luminosity goal of 15 fb −1 are discussed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.