Abstract

This paper presents the status and experiences of Low and Intermediate-level radioactive Waste(LILW) disposal facility in Korea. The LILW disposal facility of 800,000 drums (200 L/drum) is being constructed in the site of KORAD's LILW Disposal Center(206 m2, Gyeongju-si). The first stage of the LILW facility construction was completed in June 2014, and approved for use by Nuclear Safety and Security Commission (NSSC) in December 2014. The first stage of the LILW facility is a type of underground silo with disposal capacity of 35,200 m3 (100,000 drums). The second stage of the LILW facility is under construction to be completed by December 2020. Site construction is currently underway. The second stage of the LILW facility is a type of near-surface disposal with disposal capacity of 32,875 m3 (125,000 drums)