Abstract

The topography, hydrogeological condition and engineering geological condition of various regions are complicated in China. The demolition and site preparation of mountains construction site generally need to do a large number of excavation and embankment fill, need to consider the problem such as landslide and slope, temporary earthwork stack. The available soil temporary stack involving the question such as safety, environmental protection, etc, with two instances to illustrate should according to quality, safety and environmental protection objectives for construction management of temporary pile soil.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.