Abstract

Based on the special section of high fill soggy embankment in Chongqing Steel Plant Railway, we successfully implemented high fill soggy embankment’s dynamic stability monitoring by laying high precision measuring instruments inside the embankment. This stability monitoring reveals the changes and rules of the lateral horizontal displacement, layered settlement, internal stress of this particular form of embankment and provides references for designing and construction for high fill soggy embankment in mountainous area.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.