Abstract
In order to improve the mining benefit of coal resources, Chang Gouyu Coal Mine carried out the technology of mining without coal pillar in steep seam. The key of the technology was to ensure a long-term stability of the cross-entry roadway across the seam. Through the analysis of the nature of steep seam roof and floor rock, and based on the stability analysis and loose circle measured of surrounding rock of crosscut roadway, we brought forward adopting shotcrete rockbolt mesh and U-shaped steel complex support structure system. This complex support system could flex lengthways and compress in radial direction. The entirety integrated with the surrounding rock, and they formed into a whole. Application of the complex support system could effectively control the deformation of the surrounding rock collapse, and maintain the stability of the crosscut.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.