Abstract
In this paper we consider the single-machine parallel-batching scheduling problem with family jobs under on-line setting in the sense that we construct our schedule irrevocably as time proceeds and do not know of the existence of any job until its arrival. Our objective is to minimize the maximum completion time of the jobs (makespan). We deal with two variants of the problem: the unbounded model in which the machine can handle infinite number of jobs simultaneously and the bounded model. For the unbounded case, we provide an on-line algorithm with a worst-case ratio of 2 and prove that there exists no on-line algorithm with a worst-case ratio less than 2. For the bounded case, we also present an on-line algorithm with a worst-case ratio of 2.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.