Abstract

We study the earliness-tardiness scheduling problem on a single machine with due date assignment and controllable processing times. We analyze the problem with three different due date assignment methods and two different processing time functions. For each combination of these, we provide a polynomial-time algorithm to find the optimal job sequence, due date values and resource allocation minimizing an objective function which includes earliness, tardiness, due date assignment, makespan and total resource consumption costs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.