Abstract

This paper addresses efficient berth and crane allocation scheduling at a multi-user container terminal. First, we introduce a formulation for the simultaneous berth and crane allocation problem. Next, by employing genetic algorithm we develop a heuristic to find an approximate solution for the problem. The fitness value of a chromosome is obtained by crane transfer scheduling across berths, which is determined by a maximum flow problem-based algorithm based on a berth allocation problem solution defined by the chromosome. The results of numerical experiments show that the proposed heuristic is applicable to solve this difficult but essential terminal operation problem.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.