Abstract
This paper presents the result of a study of the effect of cooling tower system in terms of performance and cost of maintenance. The study was conducted in a two-storey shopping complex building. Observation on site was held to obtain data on full load amp (FLA) and chilled water temperature (CWT) before and after servicing cooling tower unit. Energy of cooling tower were evaluated by analysis of FLA and CWT in percentage value. The condition on the system and component were also observed to differentiate the condition before and after treatment. The result obtained showed that cooling system performance after the treatment was increased.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Innovation and Industrial Revolution
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.