Abstract

The conjugation of High Performance Computing (HPC) and Grid paradigm with applications based on commercial software is one among the major challenges of today e-Infrastructures. Several research communities from either industry or academia need to run high parallel applications based on licensed software over hundreds of CPU cores; a satisfactory fulfillment of such requests is one of the keys for the penetration of this computing paradigm into the industry world and sustainability of Grid infrastructures. This problem has been tackled in the context of the PI2S2 project that created a regional e-Infrastructure in Sicily, the first in Italy over a regional area. Present article will describe the features added in order to integrate an HPC facility into the PI2S2 Grid infrastructure, the adoption of the InifiniBand low-latency net connection, the gLite middleware extended to support MPI/MPI2 jobs, the newly developed license server and the specific scheduling policy adopted. Moreover, it will show the results of some relevant use cases belonging to Computer Fluid-Dynamics (Fluent, OpenFOAM), Chemistry (GAMESS), Astro-Physics (Flash) and Bio-Informatics (ClustalW)).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.