Abstract

AbstractThe Shearwater Field is a high-pressure–high-temperature (HPHT) gas condensate field located 180 km east of Aberdeen in UKCS Blocks 22/30b and 22/30e within the East Central Graben. Shell UK Limited operates the field on behalf of co-venturers Esso Exploration and Production UK Limited and Arco British Limited, via a fixed steel jacket production platform and bridge-linked wellhead jacket in a water depth of 295 ft.Sandstones of the Upper Jurassic Fulmar Formation constitute the primary reservoir upon which the initial field development was sanctioned; however, additional production has been achieved from intra-Heather Formation sandstones, as well as from the Middle Jurassic Pentland Formation. Following first gas in 2000, a series of well failures occurred such that by 2008 production from the main field Fulmar reservoir had ceased. This resulted in a shut-in period for the main field from 2010 before a platform well slot recovery and redevelopment drilling campaign reinstated production from the Fulmar reservoir in 2015. In addition to replacement wells, the redevelopment drilling also included the design and execution of additional wells targeting undeveloped reservoirs and near-field exploration targets, based on the lessons learned during the initial development campaign, resulting in concurrent production from all discovered reservoirs via six active production wells by 2018.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call