Abstract

<p>In this article are presented the procedures and the results of open pit optimal contour "Delici" choice near Ugljevik, Republic of Srpska. By using of LG 3D algorithm for optimization in the Whittle FourXTM is determined a series of open pit shales based on the various income factors (Revenue factor) with iteration of 0.03 of change in coal prices according to the base price of 2.2 €/GJ. For each contour were calculated the cash flows, and the optimal contour of open pit was determined based on the maximum value of NPV (net present value). The access ramps, transport roads, geometric elements of benches, final slopes and calculations of the exploitation coal reserves were done inside of the optimal open pit contour. After determing of optimal open pit contour it was defined the mine plan, dynamics of exploitation and choice of waste disposal location.</p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.