Abstract
SUMMARYThe seismic demand hazard, which gives the rate/probability of exceeding a specified level of seismic demand/response in a given exposure period, is a key measure used to quantify the seismic performance of structures. Because of its simplicity in implementation, the intensity measure (IM)‐based approach is the most common method for computation of the seismic demand hazard. One observed detrimental consequence of the IM‐based approach is that the practical computation of the seismic demand hazard appears to be dependent on the IM used in its computation. This manuscript demonstrates theoretically that the seismic demand hazard for a particular structure at a specific location is unique irrespective of the conditioning IM used in its computation. More importantly, it is demonstrated that this theoretical result can be consistently obtained in a practical context via a six‐step process based around the selection of ground motion records using the generalised conditional intensity measure (GCIM) approach. Copyright © 2012 John Wiley & Sons, Ltd.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.