Abstract

A secondary recovery project involving water injection and gas-lift facilities was installed in the Ogharefe field in 1979 following detailed reservoir simulation studies. Two years' operation provides the opportunity to discuss the progress of the project so far.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call