Abstract

The algorithm Earliest Deadline First with Virtual Deadlines (EDF-VD) was recently proposed to schedule mixed-criticality task sets consisting of high-criticality (HI) and low-criticality (LO) tasks. EDF-VD distinguishes between HI and LO mode. In HI mode, the HI tasks may require executing for longer than in LO mode. As a result, in LO mode, EDF-VD assigns virtual deadlines to HI tasks (i.e., it uniformly downscales deadlines of HI tasks) to account for an increase of workload in HI mode. Different schedulability conditions have been proposed in the literature; however, the schedulability region to fully characterize EDF-VD has not been investigated so far. In this paper, we review EDF-VD's schedulability criteria and determine its schedulability region to better understand and design mixed-criticality systems. Based on this result, we show that EDF-VD has a schedulability region being around 85% larger than that of the Worst-Case Reservations (WCR) approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.