Abstract

Smart grid deployment unfolds within a diverse array of multi-institutional arrangements that may be too fragmented and decentralized to allow for the kind of large-scale and coordinated investments needed to properly deploy the smart grid. This case study provides an account of how one state arranged for and eventually deployed smart grid technology to over 85 percent of its resident. The study asks: does the deployment of the smart grid introduce new socio-political variables into the electricity distribution industry? To make sense of the socio-political variables shaping the industry and regulators, the Salience–Complexity Model is used to assess whether the smart grid raises or lowers the level of public scrutiny caste upon the industry (issue salience) and the level of technical capacity needed to execute and utilize the smart grid (technical complexity). The conclusions to be drawn from this study include: smart grid technology heightens the issue salience and the technical complexity of electricity distribution, but that the smart grid will likely not have a significant impact on the restructuring of electricity regulation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.